Clendenin Lumber - Donalds SC

The project consisted of:

WDH120 Log Trough Infeed and Outfeed with containment safety tunnels specifically designed to work with a ring type debarker

Live Log Deck, "Heavy Duty" version, WH124 chain, 7" Sq stacked tube, 3-7/16" headshaft, Anson urethane lined bearings, 15 HP "S" type drive, with added option of a belt drive between motor and reducer for smoother operation

Custom Booth, 12'6" x 10', with sloped front, optional gray tinted windows, quality black vinyl acoustical wall insulation, fully assembled with LED lighting, EMT Galvanized formed conduit, breaker panel and receptacles 

Photos / Videos

Mellott Equipment Installation at Clendenin Lumber Mill Site
WDH120 Log Trough with extra reinforcement and containment safety tunnel
WH124 Heavy Log Deck Infeed
Mellott Log Deck, Log Trough System with Nicholson A6 Ring Debarker
Custom Operator's Booth 12'6" x 10'